Transmission Line

Northwest Arkansas

Transmission Line

Background

The City wanted to tie two substations together through a new transmission line. Connecting substations offers many benefits, including enhanced reliability and redundancy in the event of a power failure, as well as more even load distribution to prevent overload conditions. This project would also improve power quality through voltage regulation and reduced fluctuations. Maintenance and load transfers would become easier with the connection, providing more flexible operation. It also supports future growth and improves emergency response.

The City hired Allgeier Martin to assess their needs. As an extension of the client’s team, AMA helped determine the best route and design for the tie-in.

Transmission Line

Activity

Technical Design & Features

  • Three group-operated air-break switches allow the Client to have more control over the system
  • Design: Oct 2022 – Feb 2024
  • Construction: Aug 2025 – Feb 2026
  • Join the Allgeier Martin team today!

    Become part of a dynamic, employee-owned firm that values collaboration and work-life balance. Enjoy a robust benefits package and opportunities for growth. Submit your resume today and take the first step towards an exciting career with us!