Schifferdecker Roadway & Bridge Approach & Alignment

Joplin, MO

Schifferdecker Roadway & Bridge Approach & Alignment

Background

The Schifferdecker Avenue bridge was structurally deficient. The bridge was narrow, over topped frequently, and needed to be replaced. The outdated bridge had been repaired frequently over several years. Increased traffic flow in the area necessitated bridge replacement and realignment of Schifferdecker. Improving traffic flow was the ultimate goal. The City of Joplin required an engineering consultant to design improvements for increased safety and accessibility.

Schifferdecker Roadway & Bridge Approach & Alignment

Activity

The City hired AMA to work with the City’s design staff. The team developed preliminary roadway alignments to reconfigure the intersection of Schifferdecker Ave., Zora Ave., and Peace Church Rd. The project included the construction of a new bridge over Turkey Creek on new alignment. The improved geometrics would allow unrestricted traffic movements on Schifferdecker and Zora. The new alignment’s elevated profile grade eliminates overtopping caused by flooding events and improves traffic flow and safety of the area. The project responsibilities were divided into two elements:

AMA provided final design of the bridge, including preparation of design plans to relocate a waterline

The City of Joplin performed final design of the roadway with the input and advice of AMA engineers.

Allgeier Martin was retained to inspect the construction of the new bridge, roadway, and waterline.

Technical Design & Features

  • Project Length: 2174’
  • Bridge length: 283’
  • Bridge Width: Two 12’ driving lanes, one 13’ left turn lane & Two 7’ shoulders
  • Bridge superstructure (70’ - 70’ - 70’ - 70’) prestressed concrete I-Girder spans
  • Foundation: structural steel pile end bents & drilled shaft intermediate bents
  • Corps of Engineers Permit, Fish and Wildlife Endangered Species, Missouri Dept. of Conservation, and Missouri Dept. of Natural Resources Clearances
  • FEMA Clearance Certifications
  • Funding: Jasper County, City of Joplin, Joplin Special Road District Cost Sharing

Join the Allgeier Martin team today!

Become part of a dynamic, employee-owned firm that values collaboration and work-life balance. Enjoy a robust benefits package and opportunities for growth. Submit your resume today and take the first step towards an exciting career with us!