Route Z/Pennell St. Sidewalk Improvements

Carl Junction, MO

Route Z/Pennell St. Sidewalk Improvements

Background

The City of Carl Junction witnessed regular pedestrian travel along Route Z from students and the general public. Residents were forced to either walk on the roadway shoulder or in the grass along the back side of the ditch. This became a significant safety concern for the City.

Route Z/Pennell St. Sidewalk Improvements

Activity

Allgeier Martin provided design and construction engineering services for the addition of sidewalk from Memorial Park to Temple St., including driveways, curb ramps, and crosswalks. The project also included the installation of a reinforced concrete box culvert, curb and gutter, storm sewer inlet and piping, and asphalt paving. The project is part of a long-range master plan that connects City Hall to area schools, the commercial district, residential areas, and Thom’s Station Trail.

Technical Design & Features

General

  • Grant application & MODOT permitting
  • Topographic/boundary surveying
  • Stormwater management

Utility Relocation

  • Construction inspection services
  • Concrete field-tested materials
  • Installed 4,000’ of 5’-8’ concrete sidewalk
  • Funded in part with Federal funds from MoDOT’s Surface Transportation Program
  • Engineer-of-Record Phase I: Kurt Higgins
  • Engineer-of-Record Phases II-IV: Michael Keaton

Phase II

  • Added approx. 700 LF sidewalk
  • 8’x2.5’ reinforced concrete box culvert