Background

In preparation for a planned roundabout project in Northwest Arkansas, Allgeier Martin worked with an electric cooperative to relocate an existing distribution line impacted by the new roadway alignment. The line crossed a state highway and paralleled two intersecting roads within the project limits. It also crossed a foreign utility and was located near a high-pressure gas line, requiring careful design and coordination. AMA designed a distribution line rebuild to shift the alignment to the edge of the proposed right-of-way, tying the new configuration into the existing system. The team participated in multi-utility coordination meetings, assisted with easement acquisition and condemnation services, and provided full staking support—including data entry into the Client’s Futura software, staking sheet development, and Coop mapping updates.

Road Move

Activity

Technical Design & Features

  • Approximately 0.25 miles of three-phase rebuild and removal
  • One road crossing
  • One foreign utility crossing
  • Sixteen work points
  • Right-of-way adjustments and easement coordination
  • Futura data entry, staking sheets, and Green Dot mapping for construction
  • Join the Allgeier Martin team today!

    Become part of a dynamic, employee-owned firm that values collaboration and work-life balance. Enjoy a robust benefits package and opportunities for growth. Submit your resume today and take the first step towards an exciting career with us!

    Some engineers looking at diagrams.