New 69kV Line

Southeast Missouri

New 69kV Line

Background

To increase capacity and provide voltage support across their 69 kV system, the Power Cooperative initiated the construction of a new 69 kV transmission line. Allgeier Martin supported the project from preliminary routing through final closeout. Services included route evaluation, preparation of right-of-way easement exhibits, line design, material specification, and procurement administration.

AMA also developed a Land Disturbance Permit (SWPPP) plan, prepared and administered contracts for clearing and construction, served as the Owner’s representative throughout construction, and produced final record drawings.

New 69kV Line

Activity

Technical Design & Features

  • 11.1 miles of new line
  • Single steel pole, direct-embedded davit arm construction
  • Optical ground wire (OPGW) installed for communication and system reliability
  • Join the Allgeier Martin team today!

    Become part of a dynamic, employee-owned firm that values collaboration and work-life balance. Enjoy a robust benefits package and opportunities for growth. Submit your resume today and take the first step towards an exciting career with us!

    Some engineers looking at diagrams.