Restoration of 500kV Powerline: A Record-Breaking Achievement


On December 10, 2021, a devastating tornado left a 500kV powerline in ruins. Seventeen lattice steel structures crumbled and twisted taking a major part of the transmission grid out of service. A quick and responsive engineering partner was required. Allgeier Martin and Associates rose to the challenge. AMA’s successful work history led the client to trust us with this rebuild project. This video tells the story of how AMA planned and designed it.
Key Highlights
- Unrivaled Speed: AMA completed planning and design fast enough for contractors and material vendors to finish in 6 months. Their swift response ensured this key part of the infrastructure was placed back in service as soon as possible.
- Expert Planning & Design: The team's careful planning and design expertise were crucial for success. The strategic approach ensured the replacement of the damaged structures was carried out seamlessly.
- Uncompromising Quality: Despite the time pressures, AMA prioritized the highest standards of quality and safety. The engineers and technicians were masterful. They made sure each steel support met regulations and exceeded expectations.
- Reliable Partner: Electric utilities can trust AMA to deliver exceptional results. The company culture is committed to client satisfaction. Personal service makes them a reliable and preferred partner in powerline restoration.
In this video, AMA shows their expertise in power electric transmission and storm restoration. Their ability to deliver exceptional results in record time sets them apart as a trusted and reliable partner in the field.
Contact AMA today to experience their unparalleled service and expertise in powerline engineering.
Join the Allgeier Martin team today!
Become part of a dynamic, employee-owned firm that values collaboration and work-life balance. Enjoy a robust benefits package and opportunities for growth. Submit your resume today and take the first step towards an exciting career with us!
